← Pulad LabsGuides · Ayaro

Guides / Stormwater pond and BMP inspection form

Stormwater pond and BMP inspection form

By Emre, Pulad Labs · Updated 2026-11-21

One form per BMP per inspection. Copy it into Word or a spreadsheet, add photo numbers, and give the owner a signed copy.

Free post-construction BMP inspection form

POST-CONSTRUCTION STORMWATER BMP / POND INSPECTION FORM
Site / property: [name, address]      Owner / HOA / manager: [ ]
BMP ID and type: [ ] wet pond  [ ] dry pond  [ ] bioretention  [ ] underground detention  [ ] sand filter  [ ] other: [ ]
Permit / maintenance agreement no.: [ ]      Inspector: [name, certification no.]
Date: [ ]   Weather: [ ]   Rain in last 48 h: [__] in

Item | OK | Needs maintenance | Needs repair | Notes / photo no.
Inlets / pipes / headwalls (blockage, erosion) | [ ] | [ ] | [ ] | [ ]
Forebay (sediment depth __ in) | [ ] | [ ] | [ ] | [ ]
Embankment / dam (cracks, seepage, burrows, trees) | [ ] | [ ] | [ ] | [ ]
Side slopes and vegetation (bare areas, erosion) | [ ] | [ ] | [ ] | [ ]
Outlet structure / riser / trash rack (clogging) | [ ] | [ ] | [ ] | [ ]
Emergency spillway | [ ] | [ ] | [ ] | [ ]
Permanent pool / water level, algae, odor | [ ] | [ ] | [ ] | [ ]
Sediment accumulation in pond / basin | [ ] | [ ] | [ ] | [ ]
Trash and debris | [ ] | [ ] | [ ] | [ ]
Access road / gate / signage | [ ] | [ ] | [ ] | [ ]

Overall condition: [ ] functioning as designed  [ ] maintenance needed  [ ] repair needed (notify owner and authority)
Recommended work and deadline: [ ]

Inspector signature: ____________________  Date: ______

During construction, use the SWPPP inspection report template.

General information. Inspection frequency, inspector certification and reporting rules come from your city, county or state program.

Want SWPPP inspections on your phone, with a rain alert when a 24-hour inspection is due?

Frequently asked questions

Who has to inspect stormwater ponds?

Many cities and counties require the owner (often an HOA, business or property manager) to have permanent stormwater BMPs inspected on a schedule, often yearly, by a qualified or certified inspector, and to keep or submit the report.

What does a pond inspection cover?

Inlets and pipes, forebay sediment, the embankment, slopes and vegetation, the outlet structure and trash rack, the emergency spillway, the pool, sediment, debris and access, with photos and recommended maintenance.