Guides / SWPPP inspection checklist
SWPPP inspection checklist
Print it or keep it on your phone for the site walk, then copy the findings into the signed report.
Free SWPPP inspection checklist
SWPPP / STORMWATER INSPECTION CHECKLIST Site: [ ] Date: [ ] Inspector: [ ] Inspection: [ ] weekly / routine [ ] within 24 h after 0.25 in rain [ ] other Rain since last: [__] in PERIMETER AND SEDIMENT CONTROLS Yes No N/A Action needed Silt fence / fiber rolls intact, trenched, not overtopped [ ] [ ] [ ] [ ] Sediment removed where it reaches 1/2 of the height [ ] [ ] [ ] [ ] Inlet protection in place and clean [ ] [ ] [ ] [ ] Sediment basin / trap below cleanout mark [ ] [ ] [ ] [ ] STABILIZATION Disturbed areas idle 14+ days stabilized (seed / mulch) [ ] [ ] [ ] [ ] Slopes and channels protected (blankets, check dams) [ ] [ ] [ ] [ ] TRACK-OUT AND HOUSEKEEPING Construction entrance in good shape; no track-out on road [ ] [ ] [ ] [ ] Concrete washout contained and not overflowing [ ] [ ] [ ] [ ] Materials covered; spill kit on site; trash contained [ ] [ ] [ ] [ ] Portable toilets secured away from inlets [ ] [ ] [ ] [ ] DISCHARGES Discharge at outfalls observed? [ ] [ ] [ ] [ ] Sediment / turbidity / sheen leaving the site? [ ] [ ] [ ] [ ] SWPPP ON SITE AND UP TO DATE (map, BMPs, contacts) [ ] [ ] [ ] [ ] Corrective actions and due dates: [ ] Inspector signature: ____________________
For the signed record, use the SWPPP inspection report template.
General information. Your Construction General Permit (EPA or state) sets the exact inspection items, frequency and wording.
Want SWPPP inspections on your phone, with a rain alert when a 24-hour inspection is due?
Frequently asked questions
What does a SWPPP inspection check?
Perimeter and sediment controls, inlet protection, sediment basins, stabilization of idle areas, the construction entrance and track-out, concrete washout, material storage and housekeeping, any discharges, and whether the SWPPP is on site and current.
Checklist or report?
A checklist makes the walk fast and consistent; most permits still require a signed inspection report with corrective actions. Use the checklist in the field and the report for the file.