SWPPP rain log and corrective action log

By Emre, Pulad Labs · Updated 2026-11-21

Read the gauge at the same time each day, write it down, and log the inspection whenever the storm trigger is met.

Free rain log and corrective action log

SWPPP RAIN LOG AND CORRECTIVE ACTION LOG              Site: [ ]   Permit / NOI no.: [ ]   Season: [ ]
Rain gauge location: [ ]     Gauge type: [ ] manual  [ ] electronic  [ ] nearest NOAA/NWS station: [ ]

RAIN LOG
Date | Time read | Rainfall (in / mm) since last reading | 0.25 in (6 mm) or more? | Inspection required by (date, time) | Inspection done (date, by) | Initials
[ ]  | [ ]       | [ ]                                   | [ ] yes  [ ] no         | [ ]                                 | [ ]                        | [ ]
[ ]  | [ ]       | [ ]                                   | [ ] yes  [ ] no         | [ ]                                 | [ ]                        | [ ]

CORRECTIVE ACTION LOG
Date found | Problem (BMP, location) | Action required | Due date | Date completed | Completed by | SWPPP updated? 
[ ]        | [ ]                     | [ ]             | [ ]      | [ ]            | [ ]          | [ ] yes
[ ]        | [ ]                     | [ ]             | [ ]      | [ ]            | [ ]          | [ ] yes

Use the SWPPP inspection checklist on site and the inspection report template for the signed record.

General information. Your Construction General Permit sets the rain trigger, inspection timing and corrective action deadlines.

Want SWPPP inspections on your phone, with a rain alert when a 24-hour inspection is due?

Frequently asked questions

Why keep a rain log for a SWPPP?

If your permit uses the 14-day plus storm-event schedule, a storm of 0.25 inches or more triggers an inspection within 24 hours. A rain log shows when each trigger happened and that the inspection followed on time.

What is a corrective action log?

A running list of problems found during inspections (a torn silt fence, a clogged inlet), the action needed, the due date and when it was fixed. Permits set deadlines for corrective actions, so the log is your proof.